Customization: | Available |
---|---|
Warranty: | 12 Months |
Feature: | Automation, Precision, High Efficiency |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Precision machining frame.
Precision parallelism ±0.02mm, flatness ±0.02mm.
Section-compartmentalized heating, temperature control uniformity±0.02; control accuracy rate 1%
The accuracy of stroke control is high, and the repetitive precision is controlled in 0.1mm.
Extremely low levels of noise and vibration.
Hydraulic system equipped with fault monitoring device.
PLC control system with digital display.
High operating temperature.
No. | Item | Unit | Data | |||||
1 | Nominal Pressure | KN | 500 | 1000 | 2000 | 3000 | ||
2 | Rated maximum working pressure |
Mpa | 20 | |||||
3 | Distance between Upper&Lower Platform | mm | 300 | |||||
4 | Max Stroke of Cylinder | mm | 300 | |||||
5 | Available Size of Platform | Left& Right |
mm | 500 | 500 | 1000 | 1300 | |
Front& Rear |
mm | 500 | 500 | 1000 | 800 | |||
6 | Running Speed of Platform |
Fast Running Upwards | mm/s | 1-60 | ||||
Fast Running Downwards |
1-60 | |||||||
Slow Running Upwards |
mm/s | 0.01-3 | ||||||
Slow Running Downwards | mm/s | 1-30 | ||||||
7 | Parallelism Degree of Upper&lower Platform | mm | ±0.02 | |||||
8 | Working Platform Flatness | mm | ±0.02 | |||||
9 | Pressure control Precision | KN | ±1% | |||||
10 | Max Temperature of Hot Plate | ºC | 250 | |||||
11 | Heating Rate(Controllable) | ºC/min | 1-6 | |||||
12 | Matrix Parameter |
Pressure Gradient | KN | 9 | ||||
13 | Temp Gradient | ºC | 9 | |||||
14 | Time Gradient | S | 9 | |||||
15 | Temp Display Control Precision | ºC | ±0.5 | |||||
16 | Hot Plate Flat Temp Error | ºC | ±2 | |||||
17 | Equipment Pressure Maintaining & Drop | MPa | ≤1/2 | |||||
18 | Motor Power(approximate) | KW | ≤3KW | |||||
19 | Heating Power | KW | 20 | 30 | 35 | 40 | ||
20 | Distance between Lower Hot plate and ground | mm | ≤750 | 800 | ||||
21 | Total Weight | KG | <=2000 | 3000 | 80000 | 12000 |
What's the delivery time?
Three to six months. Our products are start produce after the order, we need three to six months to research and development, production and debugging that ensure the quality of our product before delivery to the customer.
How install the machine?
We will send technician overseas installing and training for our customer.
What quality can I expect from Shuntian machinery?
We regards the product's quality as the most important duty.